Building Commissioning

Fundamental Cx

Green Living’s Commissioning Authorities (CxA) begin the commissioning (Cx) process early in the design phase and execute additional activities after system performance verification.  GL has historically provided commissioning services for projects when we manage the LEED certification process, as it streamlines the process, increases efficiencies, and diminishes disruption during construction. The advantages are both environmental and economic. Buildings that perform as intended consume significantly less energy with improved design and construction coordination with fewer change orders, maintenance, and operation costs.

 

Fundamental Commissioning Scope

 

  • Develop the Owner’s Project Requirements (OPR)
  • Develop the Basis of Design (BOD)
  • Review the Project Design
  • Develop & Implement a Commissioning Plan
  • Incorporate Commissioning Requirements into Construction Documents
  • Develop Construction Checklists
  • Develop System Test Procedure
  • Verify System Test Execution
  • Maintain an Issues & Benefits Log throughout the Commissioning Process
  • Prepare the Final Commissioning Report
  • Prepare the Final Commissioning Report
  • Document findings & recommendations and report directly to the owner

Develop Current Facilities Requirements (CFR) and Operations and Maintenance Plan

Enhanced Cx

GL commissioning team performs design review, post-occupancy review, and seasonal testing services to help project teams add value to the commissioning process on high-performance projects.

Enhanced Commissioning Scope

  • Review contractor submittals
  • Include manual system requirements in construction documents 
  • Include operator and occupant training requirements in construction documents –
  • Verify system manual updates & delivery –
  • Verify operator and occupant training delivery and effectiveness –
  • Verify seasonal testing –
  • Review building operations ten months after substantial completion –
  • Develop an ongoing Commissioning Plan –
  • Develop monitoring-based procedures and identify points to be measured and evaluated to assess the performance of energy- and water-consuming systems.

Total Building Cx

We provide commissioning services for federal projects per UFC 1-200-02 High Performance and Sustainable Building Requirements.

    Building Envelope BECx

    The CxA will perform the commissioning process (CxP) activities for the building’s thermal envelope following ASHRAE Guideline 0–2005 and the National Institute of Building Sciences (NIBS) Guideline 3–2012, Exterior Enclosure Technical Requirements for the Commissioning Process, as they relate to energy, water, indoor environmental quality, and durability.

     

     

    Envelope Commissioning Scope

    • Review contractor submittals.
    • Verify the inclusion of systems manual requirements in construction documents.
    • Verify the inclusion of operator and occupant training requirements in construction documents.
    • Verify systems manual updates and delivery.
    • Verify operator and occupant training delivery and effectiveness.
    • Verify seasonal testing.
    • Review building operations ten months after substantial completion.
    • Develop an ongoing commissioning plan.